1. Know your floor before you look at anyone else
The floor is your cost of goods per unit for this strength and pack, plus the cost of serving this buyer: logistics, stock-holding obligations, penalties for supply failure and any rebate or payback. Below the floor, winning loses money. Many teams only discover the floor after the award.
2. Find the price level that has won before
Look for the deepest price level that has won for the same molecule and strength with the same or similar buyers, and how it moved over the last rounds. A national average hides the spread between buyers, so compare like with like: the same lot structure, the same award criteria and a similar volume.
3. Read the competition
- How many suppliers hold an authorisation for this molecule in this market.
- Who bid last time, and how far each was from the winner.
- Who is likely to have lower costs, for example because it makes the active ingredient itself.
- Whether a new entrant has just received an authorisation.
- Whether the lot is shared between partners, which changes how aggressive the winner had to be.
4. Price the criteria, not only the price
Where quality, supply security or sustainability carry weight, a better score can offset a higher price up to the point the weighting allows. Work out what your expected score is worth in price terms before choosing the number.
5. Choose on expected value
For each candidate price, estimate the chance of winning and multiply it by the margin and the volume you would get. The best price is where that product is highest. This is what RGS Pricing Guidance calculates from comparable awards, with the evidence behind it ready for internal sign-off.
Questions
How do I know the lowest price that can win a tender?
Look at what won before for the same molecule, strength and type of buyer, and how far the other bidders were from it. The spread between first and second place over several rounds shows how aggressive the market is.
What if a competitor has much lower costs?
Then compete where price is not everything: tenders with quality or supply-security criteria, shared lots, or buyers where the low-cost competitor does not bid. The award history shows where each competitor bids and where it does not.